3 comments

  • I heard the Cut Bridge is the second busiest drawbridge on the East Coast.
    We need flying cars to avoid that spot. 🙂

    Like

  • I wonder if they’ll put up a stoplight on the building.
    Wasn’t there talk of widening the area under the
    railroad bridge to fix the blind curve there?

    Like

  • Remember when it was the only way out of Gloucester long ago – before my time of course but oh the stories timing is everything along with! 🙂 Dave

    Like

Leaving a comment rewards the author of this post- add to the discussion here-

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s