Good Harbor Beach Footbridge Repairs Underway

Godd Harbor Beach Footbridge Repairs ©Kim Smith 2014The crew was also hard at work repairing parts of the the stone wall that runs adjacent to the footbridge.

Godd Harbor Beach Footbridge Repairs -2 ©Kim Smith 2014.

About Kim Smith

Currently creating documentary films about the Monarch Butterfly, Black Swallowtail Butterfly, and Gloucester's Feast of St. Joseph. Landscape designer for the Gloucester Harbor Walk Gardens. Designer, lecturer, author, illustrator, photographer. Visit my blog for more information about my landscape and interior design firm- kimsmithdesigns.wordpress.com. Good Morning Gloucester daily contributor. Author/illustrator "Oh Garden of Fresh Possibilities! Notes from a Gloucester Garden"
This entry was posted in All Things Gloucester and tagged , , , . Bookmark the permalink.

One Response to Good Harbor Beach Footbridge Repairs Underway

  1. Dave Moore says:

    Sure sign of spring getting ready here and regain the access to area :-)

Leaving a comment rewards the author of this post- add to the discussion here-

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s