Updates on Engine 2 Being Built at The Pierce Factory From Fire Chief Eric Smith

Photo Album for Gloucester, MA Job 26779 August 16, 2013
This week the cab, pump house, body and water tank have all been merged with the chassis. Your apparatus now begins moving through the main assembly line. Next week your apparatus should be at the end of the main assembly line.

image

image

image

image

image

image

image

image

image

About Joey C

The creator of goodmorninggloucester.org Lover of all things Gloucester and Cape Ann. GMG where we bring you the very best our town has to offer because we love to share all the great news and believe that by promoting others in our community everyone wins.
This entry was posted in gloucester and tagged , , , , , . Bookmark the permalink.

Leaving a comment rewards the author of this post- add to the discussion here-

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s