Gloucester’s wind turbine being prepared to be lifted into place From Nubar Alexanian

Gloucester’s wind turbine being prepared to be lifted into place

Posted on November 30, 2012 by Nubar

check out the full sized photo at Nubar’s blog here

image

Each blade is 45 meters long. This is what it looks like before the cone is added and it’s lifted into place. Lost light before it could be lifted into place today. 

The photo above is a small representation of the full size photo which you can view on Nubar’s site.

About Joey C

The creator of goodmorninggloucester.org Lover of all things Gloucester and Cape Ann. GMG where we bring you the very best our town has to offer because we love to share all the great news and believe that by promoting others in our community everyone wins.
This entry was posted in gloucester and tagged , , . Bookmark the permalink.

One Response to Gloucester’s wind turbine being prepared to be lifted into place From Nubar Alexanian

  1. Gma says:

    Joey,My son and daughter in the top of the thumb in Michigan,farm 3800 acres,and have as far as the eye can see,these as huge,all over their land,and further. when the fog is rolling in off of Lake Huron,onto the farm land where all these wind mills hover gently over the crops,it is absolutely a magnificent,heart stopping,beautiful view. None of you will be sorry. Gma

Leaving a comment rewards the author of this post- add to the discussion here-

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s