Gloucester Engineering Turbine Blade Assembly Gets A Lift

Video from- You Guessed It- Ed Collard

http://www.youtube.com/watch?v=H4dp89f7t6M

Blade being lifted into place from Nubar Alexanian

www.nubar.com

photo-3

This entry was posted in gloucester, Video. Bookmark the permalink.

2 Responses to Gloucester Engineering Turbine Blade Assembly Gets A Lift

  1. Thanks for the “great” video Ed! now i have to get my neck cracked.

  2. Mary Barker says:

    Great video. Thanks

Leaving a comment rewards the author of this post- add to the discussion here-

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s