First Pictures Gloucester’s Wind Turbine In The USA From Fred Bodin

First Pictures StateSide – Wind Turbine in Boston

TurbineBoston 905wm

Turbine blades ready to be offloaded onto 270 foot long Barge Chem Caribe.

TurbineBoston1218wm

Blade lifted and moving over the to the Barge Chem Caribe. Notice the unique cradle.

TurbineBoston1218

Second blade is lowered onto Barge Chem Caribe next to another 160 foot long blade.

On Monday, October 15th, the Tug Orion will deliver the wind turbine to Gloucester. Get ready for Height Shock in November.

5 comments

Leaving a comment rewards the author of this post- add to the discussion here-

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s