Preparing the Crane to Offload the Turbine

Appling multiple  TEN TON Counter Weights to the crane base to be able to lift off the Turbines off the barge scheduled for Monday.  Workers indicated that the barge will be offloaded, first from one side and then must go back out to turn around to offload the other side.